Skip to main content
See every side of every news story
Published loading...Updated

Design-Build Team Completes Work on $68M Maintenance Facility Expansion

The Design-Build team of Stantec and Saunders Construction completed work on the $68-million Glenwood Springs Maintenance Facility in Glenwood Springs, Colorado for the Roaring Fork Transportation Authority. The expanded GMF provides indoor heated storage for 60 buses and a 9,000-square-foot second level operations space with a dispatch suite, reception area for visitors, drivers’ room, office space and locker rooms. It also includes an additional fuel and wash lane to their existing facility. The design of the facility reflects an integration of functionality, sustainability and user experience through natural lighting and climate-controlled spaces, while blending the facility into the colors of ...
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Construction Superintendent broke the news on Tuesday, June 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal