Design-Build Team Completes Work on $68M Maintenance Facility Expansion
1 Articles
1 Articles
Design-Build Team Completes Work on $68M Maintenance Facility Expansion
The Design-Build team of Stantec and Saunders Construction completed work on the $68-million Glenwood Springs Maintenance Facility in Glenwood Springs, Colorado for the Roaring Fork Transportation Authority. The expanded GMF provides indoor heated storage for 60 buses and a 9,000-square-foot second level operations space with a dispatch suite, reception area for visitors, drivers’ room, office space and locker rooms. It also includes an additional fuel and wash lane to their existing facility. The design of the facility reflects an integration of functionality, sustainability and user experience through natural lighting and climate-controlled spaces, while blending the facility into the colors of ...
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
