Skip to main content
See every side of every news story
Published loading...Updated

Construction of a Super-Heavy Section Through Fbih Is Underway, Half of the Route in Tunnels

Summary by Biznis Info
The FBiH Highways have partially changed the preliminary design of the Ivan-Ovčari highway section on Corridor 5C, between Sarajevo and Konjic, writes BiznisInfo.ba. Although the changes are not drastic and do not go beyond the scope of the spatial plan, they have led to the removal of some tunnels and bridges, which should reduce construction costs. However, it is still one of the most complex sections of the highway in Bosnia and Herzegovina, …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

1 Articles

The FBiH Highways have partially changed the preliminary design of the Ivan-Ovčari highway section on Corridor 5C, between Sarajevo and Konjic, writes BiznisInfo.ba. Although the changes are not drastic and do not go beyond the scope of the spatial plan, they have led to the removal of some tunnels and bridges, which should reduce construction costs. However, it is still one of the most complex sections of the highway in Bosnia and Herzegovina, …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Biznis Info broke the news in on Sunday, February 22, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal