Published • loading... • Updated
Construction Closed in Playa De Boca Del Río, Veracruz; Marine Ecosystem Invaded
Summary by nmas.com.mx
1 Articles
1 Articles
In the hotel area of Boca del Río, on the Manuel Ávila Camacho boulevard this land was prepared to start a construction. In the place you can see that as advances of the construction process was already found a fence of more than two meters high and with an extension of 30 meters long inside the beach area. According to environmentalists this work was planned without respecting the environment, since the construction invades the federal area on …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium