From 17 August to 4 September, Highway 301 North will be closed Monday to Friday, from 7 a.m. to 7 p.m., between Crawford Road, Thorne, and Proulx Street, Otter Lake, to allow for asphalting. A detour is planned through Highway 303 North. Read also: Engineers strike: concrete consequences in Mayo An intimate scene, but worthy of the big festivals in Val-des-Bois (27-29 August) Reminder of Vermicelles wide with Zhou Hei Ya's sesame sauce due to t…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
From 17 August to 4 September, Highway 301 North will be closed Monday to Friday, from 7 a.m. to 7 p.m., between Crawford Road, Thorne, and Proulx Street, Otter Lake, to allow for asphalting. A detour is planned through Highway 303 North. Read also: Engineers strike: concrete consequences in Mayo An intimate scene, but worthy of the big festivals in Val-des-Bois (27-29 August) Reminder of Vermicelles wide with Zhou Hei Ya's sesame sauce due to t…