Published • loading... • Updated
Cleveland Dam maintenance to lower spillway gate | North Shore Daily Post
Summary by North Shore Daily Post
1 Articles
1 Articles
Cleveland Dam maintenance to lower spillway gate | North Shore Daily Post
Metro Vancouver will carry out routine maintenance at the Cleveland Dam from September to mid-December 2025, warning that river levels in the Capilano River will fluctuate during this work. The agency says the spillway gate will be lowered on September 12 to prepare for winter storm management. During the maintenance period, people may notice changes to the dam’s appearance, including the raising and lowering of the gate, along with shifts in ri…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium