BSR application backlog rose above 1,000 in March
Summary by constructionnews.co.uk
1 Articles
1 Articles
All
Left
Center
Right
BSR application backlog rose above 1,000 in March
The number of undecided building control applications sitting with the Building Safety Regulator reached over a thousand at the end of March, figures reveal. The figure is included in the set of performance figures published by the BSR, covering January to March with updates set… The post BSR application backlog rose above 1,000 in March appeared first on Construction News.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium