Published • loading... • Updated
Brief Traffic Disruption at Voak for Pedestrian Bridge Installation Work
Summary by www.ertnews.gr
1 Articles
1 Articles
The Development Organization of Crete announced that on Monday, March 2nd, and during the period from 09:00 to 11:00 a.m., work will be carried out to install the metal structure of the P9 pedestrian bridge, as part of the implementation of the project "Improvement of Road Safety in the Georgioupolis - Petres section of the Northern Road Axis of Crete (VOAK)". For the safe execution of the work, a short-term interruption of all vehicle traffic i…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium