Skip to main content
See every side of every news story
Published loading...Updated

Bridge Replacement Northeast of Thompson is Underway

Summary by Mix 107.3 KIOW
A timber bridge built in 1949 is being removed by County crews in preparation for a new corrugated metal culvert.  The bridge is located on 120th Avenue between 460th Street and 470th Street northeast of Thompson, and has been posted with weight limits since 2000 due to deterioration of the foundation piles.  The new structure will be a buried 7-foot diameter metal culvert.  This road will be fully closed during construction and is expected to t…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Mix 107.3 KIOW broke the news in on Monday, August 25, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal