Published • loading... • Updated
Blog Post: Framatome Wins Contract To Upgrade Digital Control Systems At US Nuclear Plant
Summary by nuclearstreet.com
2 Articles
2 Articles
Framatome to modernize digital controls at Columbia Generating Station
Richland WA (SPX) Dec 05, 2025 Framatome has secured a contract to replace several digital control systems at Energy Northwests Columbia Generating Station in Washington state. The project covers system design, engineering, manufacturing, testing and on-site installation for new digital feedwater level control and feedwater heater vents and drains systems, which are central to thermal performance and plant efficiency. T
Blog Post: Framatome Wins Contract To Upgrade Digital Control Systems At US Nuclear Plant
French nuclear company Framatome has been awarded a contract to upgrade several digital control systems at Energy Northwest’s Columbia nuclear power station in the US state of Washington. The scope of the project includes system design, engineering ...
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium