Skip to main content
See every side of every news story
Published loading...Updated

b.choijilsuren: 113 Mw Power Limit Planned During Winter Peak Load 2025-2026

Summary by ikon.mn
An extended session to get acquainted with the preparations for wintering was held today at the State House. At the meeting, Energy Minister B. Choijilsuren gave the following information: He added: “As of August 15, 2025, out of 69 furnaces, which are the main equipment of thermal power plants, 27 are in work, 18 in preparation, and 24 furnaces are being repaired. 24 out of 49 turbogenerators are in operation, nine in preparation and 16 turboge…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

An extended session to get acquainted with the preparations for wintering was held today at the State House. At the meeting, Energy Minister B. Choijilsuren gave the following information: He added: “As of August 15, 2025, out of 69 furnaces, which are the main equipment of thermal power plants, 27 are in work, 18 in preparation, and 24 furnaces are being repaired. 24 out of 49 turbogenerators are in operation, nine in preparation and 16 turboge…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ikon.mn broke the news in on Monday, August 18, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal