Don't Just Read the News, Understand It.
Published loading...Updated

ASUS Announces Advanced AI POD Design Built with NVIDIA at Computex 2025

  • ASUS announced at Computex 2025 an advanced AI POD design accelerated by NVIDIA for enterprise IT applications worldwide.
  • This announcement follows ongoing efforts to deliver faster AI factory deployments with reduced risks using NVIDIA GB200/GB300 racks and advanced networking.
  • The AI POD utilizes liquid cooling to support a fully connected cluster of 576 GPUs distributed over eight racks, along with an alternative air-cooled configuration that accommodates 72 GPUs per rack.
  • The system integrates NVIDIA MGX-compliant ESC8000 servers with dual Intel Xeon processors, RTX PRO 6000 Blackwell GPUs, and ConnectX-8 SuperNIC delivering up to 800Gb/s speeds.
  • This centralized rack solution provides scalable, high-performance infrastructure that accelerates agentic AI adoption with improved efficiency, reduced TCO, and worldwide support.
Insights by Ground AI
Does this summary seem wrong?

70 Articles

All
Left
7
Center
21
Right
6
The Times of Northwest IndianaThe Times of Northwest Indiana
+67 Reposted by 67 other sources
Center

ASUS Announces Advanced AI POD Design Built with NVIDIA at Computex 2025

Enterprise-optimized reference architectures for accelerated AI infrastructure solutions

·Cherokee County, United States
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 62% of the sources are Center
62% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Charleston Gazette-Mail broke the news in Charleston, United States on Tuesday, May 20, 2025.
Sources are mostly out of (0)