Published • loading... • Updated
Assembly funds engineering restart for water treatment upgrade
Summary by Petersburg Pilot
1 Articles
1 Articles
Assembly funds engineering restart for water treatment upgrade
The Petersburg Borough Assembly voted unanimously Monday to hire an Anchorage engineering firm to revive a water treatment plant upgrade that stalled more than a decade ago — replacing a rusting open-top tank that has outlived its useful life. The assembly approved spending up to $200,600 to retain GV Jones & Associates Inc. for design and technical services on the clearwell tank replacement p...
·Petersburg, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
