5 Articles
5 Articles


Blackwater Mine plans to enter commercial production in 2025
Presently Blackwater Mine employs over 400 people in permanent roles
Artemis Gold starts commercial production at Blackwater Mine
Artemis Gold Inc. says it has achieved commercial production at the Blackwater Mine in central British Columbia. Over the past 30 days, the average tonnes per day processed through Blackwater’s crushing circuit was 17,700 tonnes per day (107% of design capacity), while the milling circuit has averaged over the same period 15,300 tonnes per day […]
Artemis Gold Hits Commercial Production At Blackwater, Releases 2025 Guidance
Artemis Gold (TSXV: ARTG) has officially hit commercial production at their new Blackwater mine in British Columbia. The designation is said to follow the crushing circuit processing on average 17,700 tonnes of material over the last 30 days, while the milling circuit has processed on average 15,300 tonnes of ore per day over the same time period. Gold production year to date meanwhile has already hit 30,000 ounces. With the commencement of comm…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage