Arab Bridge Is No Longer Two Roads in July and August because of Works
2 Articles
2 Articles
The Arrábida Bridge Will Undergo Repairs and Will Lose One Lane in Each Direction During the Summer.
The Arrábida Bridge will undergo extensive rehabilitation, with one lane reduced in each direction during July and August. The Arrábida Bridge, one of the main road links between Porto and Vila Nova de Gaia, will be the subject of a major rehabilitation project, which will cause traffic disruptions during July and August, according to the Jornal de Notícias (paid access). During this period, the crossing will be reduced to one less lane in each …
The bridge of the Arab will enter into work, the post of the Portuguese Infrastructures (IP), for the rehabilitation of the pillars and the table. The first signs will be visible with the installation of the stables, to be installed by June. For the carists, the intervention will have effect between July 15 and August 31, when the crossing takes place with less than one route in every sense.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
