Published • loading... • Updated
Al Hoceima: Continued Field Operations to Prevent Flood Risk
Summary by Maroc Diplomatique
1 Articles
1 Articles
The field operations aimed at strengthening preventive measures against the risks of flooding continue in Al Hoceima, through the curing of liquid sewerage systems and the cleaning of drains of deposits and impurities whose accumulation could hinder the normal flow of rainwater. The joint efforts of the Société régionale multiservices (SRM) de ... This article Al Hoceima: Continuation of field operations aimed at preventing the risks of flooding…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium