Afcons Begins Casting Segments for Bhopal Metro’s Blue Line (BH-05)
Summary by The Metro Rail Guy
1 Articles
1 Articles
Afcons Begins Casting Segments for Bhopal Metro’s Blue Line (BH-05)
Afcons Infrastructure this Monday began pouring concrete to cast their first box segment for Bhopal Metro Phase 1 project’s 12.915 km Blue Line (Line-2) which will connect Bhadbhada Chauraha – Ratnagiri Tiraha via 14 elevated stations. Bhopal Metro’s Package BH-05 includes the construction of the entire Blue Line’s viaduct, 13 stations, and a ramp leading to Subhash […] The post Afcons Begins Casting Segments for Bhopal Metro’s Blue Line (BH-05)…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium