Advait Energy Transitions secures 180 MW/360 MWh BESS EPC project in Gujarat
Summary by Pv Magazine India
1 Articles
1 Articles
All
Left
Center
Right
Advait Energy Transitions secures 180 MW/360 MWh BESS EPC project in Gujarat
Advait Energy Transitions Ltd has received an order from Gujarat BESS Pvt Ltd to set up a 180 MW/360 MWh (AC side) battery energy storage system (BESS) project on an EPC basis.Advait Energy Transitions Ltd (formerly Advait Infratech Ltd) announced today that it has received an order from Gujarat BESS Pvt Ltd to set up a 180 MW/360 MWh (AC side) battery energy storage system (BESS) project on an EPC basis. The project will be located in Sanand ci…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage