A544 Bridge Loses Its Construction Site "Clothing"
Summary by Aachener-zeitung.de
1 Articles
1 Articles
Another eight weeks until the motorway is cleared to Europaplatz in Aachen. A drone overflight shows what is happening at the bridge construction site.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium