Published • loading... • Updated
A Hotel in the Brazilian Amazon Rainforest Is Running 100% with Solar Energy and Bess
Summary by Pv-Magazine-latam.com
1 Articles
1 Articles
Huawei's initiative demonstrates the viability of storage in areas not connected to the power grid. The fully autonomous 185 kWp system has 333 modules, two 75K inverters and a BESS with two batteries that guarantee the supply of energy 24 hours a day.The jungle hotel Juma Amazon Lodge, 100 km from Manaus, now operates with a 100% autonomous and sustainable energy microgrid. The project is the result of a joint effort: Huawei Digital Power provi…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium