Don't Just Read the News, Understand It.
Published loading...Updated

After the 90-Degree Flyover, Now 'Snake-Like' Bridge Under Scrutiny in Bhopal

Summary by India Today
Two accidents within just eight hours on the Subhash Nagar Railway Over Bridge (ROB) have raised serious concerns about its design and safety, with experts and citizens questioning whether the structure is an accident waiting to happen.

12 Articles

All
Left
Center
1
Right
2
Lean Right

This bridge is very important for those who go from Bhopal's Maida Mill to Prabhat Petrol Pump or for those who go to Bhopal Railway Station, in terms of saving time and avoiding traffic jams. But the flaws in its design are overshadowing the speciality of this bridge. There is a turn on the railway track to go towards Maida Mill on the bridge and as soon as the turn ends, the divider starts. Accidents are happening due to the divider appearing …

Center

The construction of a new bridge in India causes a great stir. Due to a serious misconstruction, the Prime Minister took tough measures.

·Berlin, Germany
Read Full Article

The scandal broke out in Bhopal, India, where a new railway bridge, designed to improve urban connectivity, was at the heart of the controversy over an unusual design error.The bridge was built with a 90-degree curve just down the road, which prevents any safe turn for medium or large vehicles.The construction, which cost approximately $2.3 million, was funded by the Madhya Pradesh state government.The images of the impossible turn went viral on…

With corners and edges: the Aishbagh bridge in India. Picture: x/mukesh1275The construction of the Aishbagh bridge in Bhopal, India, took ten years, about 1'850'000 Swiss francs.But the supposed engineering mastery turned out to be a fail: its sharp curve – if you can call this corner curve at all – makes the bridge virtually inconvenient.The whole story you read here:This is of course very bad, especially for the numerous engineers who have now…

·Zürich, Switzerland
Read Full Article

The L-shaped structure, built at a cost of about 1.8 million euros, was intended to reduce the waiting time of users at a crossing. The bridge was built in...

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

diariopanorama.com broke the news in on Thursday, July 3, 2025.
Sources are mostly out of (0)

Similar News Topics