4000-tonne machines dig arterial route under Melbourne’s west - Infrastructure Magazine
Summary by Infrastructure Magazine
1 Articles
1 Articles
4000-tonne machines dig arterial route under Melbourne’s west - Infrastructure Magazine
Image: Government of Victoria/Victoria's Big BuildThe West Gate Tunnel Project is in full swing beneath Melbourne’s inner west, with tunnel boring machines (TBMs) Bella and Vida at the helm of the ambitious twin-tunnel build. TBM Bella, already in operation, is digging the 4-kilometre westbound tunnel. The machine will soon be joined by TBM Vida, set to excavate the 2.8-kilometre eastbound tunnel. Together, they are boring through up to 27 metre…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium