U.S. Navy Takes Preliminary Acceptance Of Ford-Class Aircraft Carrier John F. Kennedy
The 99% complete carrier will keep testing and training at sea as Newport News Shipbuilding finishes remaining work, the Navy said.
4 Articles
4 Articles
100,000-Ton Wait: It Took 15 Long Years for the US Navy to Almost Get a New Ford-Class Nuclear Aircraft Carrier
After the first steel cut in 2011, the Navy finally took delivery of the aircraft carrier USS John F. Kennedy (CVN-7) in August 2026. She is the second Ford-class aircraft carrier delivered to the fleet. The Kennedy is reportedly 99% complete and will now conduct a series of tests and shakedown cruises before becoming operationally […]
The 100,000-ton next-generation nuclear aircraft carrier USS John F. Kennedy (CVN 79), which will enter the U.S. Navy inventory, has successfully passed tough acceptance tests.
The U.S. Navy's new generation nuclear aircraft carrier, USS John F. Kennedy (CVN 79), has passed a crucial stage before official delivery. Having successfully completed rigorous acceptance tests, the ship has reached the preliminary acceptance phase.
Coverage Details
Bias Distribution
- 34% of the sources lean Left, 33% of the sources are Center, 33% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium




