Skip to main content
See every side of every news story
Published • loading... • Updated

Zuoyanchai Port Flood Control Project Costs over 100 Million Yuan; Shen Guixian: Prioritize Solving Localized Flooding Problems.

Summary by tvsarawak.my
(Kuching, 22nd) The Kuching Zuoyanchai Port flood control project, costing approximately RM102 million, will improve the drainage capacity of the surrounding area and reduce the risk of flooding by upgrading the drainage system, widening and deepening the river channel, and building a reservoir.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

(Kuching, 22nd) The Kuching Zuoyanchai Port flood control project, costing approximately RM102 million, will improve the drainage capacity of the surrounding area and reduce the risk of flooding by upgrading the drainage system, widening and deepening the river channel, and building a reservoir.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

tvsarawak.my broke the news on Thursday, October 22, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal