Wolf River Electric Completes Solar Panel Installation for New Ulm EDA Public Housing Project
Summary by kalkinemedia.com
1 Articles
1 Articles
All
Left
Center
Right
Wolf River Electric Completes Solar Panel Installation for New Ulm EDA Public Housing Project
ISANTI, MN, UNITED STATES, April 11, 2025 /EINPresswire.com/ -- Wolf River Electric, a Minnesota-based solar contractor, announces the completion of a solar panel installation project for the New Ulm Economic Development Authority (EDA), providing renewable energy to two public housing facilities. As the primary contractor and installer, Wolf River Electric equipped the Broadway Haus and 10 rental housing units with new solar panel systems, a pr…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage