Skip to main content
See every side of every news story
Published • loading... • Updated

Wind Power Plant Oštrc Near Posušje Received Permission to Produce Electricity - Akta.ba Vijesti

Summary by akta.ba
FERK issued a permit for the operation of the Oštrc wind farm near Posušje, with an installed capacity of 28.8 MW, which should produce 78.6 million kWh annually.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

The Oštrc wind farm in the Posušje area has received a permit for the production of electricity, marking an important step in the implementation of one of the most significant energy projects in Herzegovina. It is a wind farm with an installed capacity of 28.8 megawatts (MW), with an expected annual production of 78.6 gigawatt hours (GWh) of electricity, writes BiznisInfo.ba. The permit was issued to the company Relaks d.o.o. Posušje by the Regu…

FERK issued a permit for the operation of the Oštrc wind farm near Posušje, with an installed capacity of 28.8 MW, which should produce 78.6 million kWh annually.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

akta.ba broke the news on Friday, October 30, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal