Skip to main content
Holiday Sale — Get 40% off Vantage for yourself or as a gift
Published loading...Updated

Rhein-Sieg-Kreis approves wind turbines in Bornheim

The Rhein-Sieg-Kreis has now approved six wind turbines for Bornheim. They are to be built on the Ville-Rücken in the next two years, previously permits for the routes and power lines have to be obtained.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

2 Articles

The Rhein-Sieg-Kreis has now approved six wind turbines for Bornheim. They are to be built on the Ville-Rücken in the next two years, previously permits for the routes and power lines have to be obtained.

Read Full Article

Making a wind turbine is not carbon neutral. So the engineers are looking for solutions to lower this footprint. An idea: designing wooden wind turbine towers. A Swedish start-up is making big strides in this direction. A year ago, the Swedish start-up Modvion delivered to Varberg Energi, a Swedish electricity supplier, its very first wind turbine. It was intended to support a Vestas V 90-2.0 MW turbine, quite modest, of 2 megawatts (MW) of powe…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Révolution Energétique broke the news in on Wednesday, March 19, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal