Watkinsville to build covered pedestrian bridge
Summary by oconeeenterprise.com
1 Articles
1 Articles
All
Left
Center
Right
Watkinsville to build covered pedestrian bridge
By Nathalee Simoneau At its April 16 meeting, the Watkinsville City Council approved the design for a new pedestrian bridge on the Simonton Bridge Connector. The 105-foot bridge is part of phase two of the project, which will connect the Simonton Place neighborhood to Thomas Farm Preserve and Rocket Field. The contractor, IMI inc., was the only company to submit a bid that included a converged bridge design. The design emulates Elder Mill Covere…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage