Vertiv Accelerates AI Infrastructure Evolution in Alignment with NVIDIA 800 VDC Power Architecture Announcement
9 Articles
9 Articles


Vertiv Accelerates AI Infrastructure Evolution in Alignment with NVIDIA 800 VDC Power Architecture Announcement
/PRNewswire/ -- Vertiv (NYSE: VRT), a global provider of critical digital infrastructure, today confirmed its strategic alignment with NVIDIA's announcement of...
Nvidia consortium pushes 800V power distribution for AI datacentres
Nvidia has announced a consortium of suppliers for 800V high voltage DC power distribution in datacentres. This is a key step to supporting processing racks with 1 MW of power, starting in 2027. The move to 800V provides an improvement in end-to-end power efficiency of up to 5% while maintenance costs are reduced by up […] The post Nvidia consortium pushes 800V power distribution for AI datacentres appeared first on eeNews Europe.
Vertiv Aligns with NVIDIA AI Roadmap for 800 VDC Power
Vertiv (NYSE: VRT), a global provider of critical digital infrastructure, has announced its alignment with NVIDIA AI roadmap. The company revealed plans to deploy 800 VDC power architectures tailored for AI-focused data centers. The upcoming 800 VDC power portfolio is scheduled for release in the second half of 2026. This launch will precede the rollout of NVIDIA’s Kyber and Rubin Ultra platforms. Vertiv aims to stay ahead of one GPU generation …
Vertiv to release 800 VDC power portfolio in 2026 for AI centers
Vertiv, a company that provides digital infrastructure, announced plans to release its 800 VDC power portfolio in the second half of 2026. The portfolio will support Nvidia’s next-generation rack-scale computing platforms, including Kyber and Rubin Ultra, and is designed for large AI-focused data centers. The release is part of Vertiv’s collaboration with Nvidia to stay […] The post Vertiv to release 800 VDC power portfolio in 2026 for AI center…
Vertiv accelerates AI Infrastructure evolution | CXO Insight Middle East
Vertiv confirmed its strategic alignment with NVIDIA’s announcement of an AI roadmap to deploy 800 VDC power architectures for the next generation of AI-centric data centers. Paving the way for future-ready designs, Vertiv’s 800 VDC power portfolio is scheduled for release in the second half of 2026 — ahead of NVIDIA Kyber and NVIDIA Rubin Ultra platform rollouts. Vertiv aligns with the NVIDIA AI roadmap to stay one GPU generation ahead, enablin…
Coverage Details
Bias Distribution
- 100% of the sources are Center
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage