Uzbekneftegaz is negotiating with Technip, Axens, and KBR to modernize and expand the Bukhara refinery. No contracts have been signed; the parties are currently discussing costs, timelines, and proposal structures.
Under the proposed framework, KBR would serve as the management consultant and concept developer, Technip would handle basic and detailed engineering, and Axens would act as the licensor for technological solutions and engineering doc…
Read with caution - this story is only being covered by one news source that has a ‘low factuality’ rating, which means the outlet has a history of poor reporting practices. Learn more about factuality ratings here.