Published • loading... • Updated
Uyuni Phase Ii Solar Plant Extension Opens in Bolivia with 2.5 Mw Additional
Summary by Pv-Magazine-latam.com
1 Articles
1 Articles
A new expansion in Uyuni raises the installed capacity of the photovoltaic park to 62.5 MW, with a state investment in this phase that is around 3.4 million dollars. Bolivian President Luis Arce delivered Phase II of the Uyuni photovoltaic plant, which increases its power by 2.5 MW, to reach 62.5 MW in total, through an investment of more than 25 million Bolivians (about 3.4 million dollars). The expansion incorporates more than 4,000 bifacial m…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium