Published • loading... • Updated
UK’s first fully battery-powered pile driving rig trialled at Ardrossan school site
Summary by projectscot.com
1 Articles
1 Articles
UK’s first fully battery-powered pile driving rig trialled at Ardrossan school site
ROGER Bullivant Limited (RBL) has announced it has trialled the first ever fully battery-powered pile driving rig in the UK at a school site in North Ayrshire. The Junttan PMx2e, powered by a 392 kWh high-voltage battery system, was deployed at the Ardrossan Community Campus site, which is being built by Morgan Sindall. The rig produces no local CO2 emissions and operates with less noise pollution. The move is said to mark the first time a fully…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium