Published 9 days ago • loading... • Updated 3 days ago
BAE Systems Opens Fully Automated Munitions Plant for 155mm Shells
BAE says the £180 million plant is designed to raise 155mm shell output sixteenfold over 2023 levels, with full production expected after live trials.
On Friday, BAE Systems officially opened the United Kingdom's first fully automated large-caliber ammunition facility at Glascoed, South Wales, designed to expand 155mm artillery shell production capacity significantly.
Funded by a £180 million investment, the facility replaces labor-intensive manual handling with industrial robotics and autonomous guided vehicles to run extended production shifts safely.
Empty 155mm shell bodies machined in Washington, England, are transported to Glascoed for the melt-cast explosive filling process. Andrea Thompson, Group Managing Director of BAE Systems Digital Intelligence & Land, said the facility "delivers significantly greater capacity" and strengthens Britain's defense manufacturing.
The facility aims to raise annual 155mm production sixteen-fold compared to 2023 levels, reaching around 80,000 rounds annually. Full-scale mass production begins after an initial phase of live safety and process qualification trials.
Modernization efforts across Britain's artillery supply chain include reopening gun-barrel manufacturing in Sheffield and assisting Poland's PGZ with shell production. The project opened more than a year after its original summer 2025 debut due to strategic capacity upgrades.