Skip to main content
See every side of every news story
Published loading...Updated

Two Cracked Panels on a One-and-a-Half-Year-Old Bridge in Nalanda: Residents Say Both Lanes of the Flyover Haven't Been Operational Since Its Inauguration; Repairs Are Always Underway.

Summary by Dainik Bhaskar
There has been gross negligence in the flyover's construction. The rollers weren't properly operated. The gravel wasn't even set properly. Officials and contractors have only lined their own pockets. Since the road was built, there hasn't been a single day when both lanes have been operational. Sometimes the left lane is closed, sometimes the right. Repair work is ongoing. There's a constant fear of gravel falling on your head from the bridge." …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

There has been gross negligence in the flyover's construction. The rollers weren't properly operated. The gravel wasn't even set properly. Officials and contractors have only lined their own pockets. Since the road was built, there hasn't been a single day when both lanes have been operational. Sometimes the left lane is closed, sometimes the right. Repair work is ongoing. There's a constant fear of gravel falling on your head from the bridge." …

·Bhopal, India
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Dainik Bhaskar broke the news in Bhopal, India on Monday, September 14, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal