Published • loading... • Updated
Ts. Torkhuu: Permission to Build a Building on the Tuul-1 Collector Sewer Line Route Has Already Been Granted.
Summary by ikon.mn
1 Articles
1 Articles
The construction of the Tuul-1 collector sewer line has been ongoing since 2024 with bond funds. It is estimated that once the collector is put into operation, it will share 50% of the load of the main sewer line to the Central Treatment Plant. During yesterday's City Council meeting, the Head of the Water Management Department and representative Ts. Törkhüu said about the progress of the sewer line construction work: "During the winter, two kil…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium