Third Part of the Railway Bridge Raised to Sternschanze
3 Articles
3 Articles
The railway line between Hamburg Hauptbahnhof and Altona is currently closed for construction work. However, a new bridge construction is progressing well.On the railway line between Hamburg Hauptbahnhof and Altona, the third part of a new railway bridge has been positioned.The 98-ton steel construction has been approached and raised by a special vehicle from the assembly site, a rail spokeswoman informed. Already on Friday and Saturday, two par…
Visible sign for the rail future in Wiesbaden: This week the first repair work started at the railway bridge of the Aartalbahn in Wiesbaden via the Flachstraße. After the building had been closed for train traffic since a truck attack in 2009, this construction start marks the return of the Nassauische Touristik-Bahn (NTB) to its main line and at the same time prepares the [...] The post Work on the reactivation of the Aartalbahn in Wiesbaden st…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium
