QUEBRADILLAS – The mayor of Quebradillas, Heriberto Vélez Vélez, reported that on Saturday, May 23, the pedestrian bridge located on the PR-2 road will be removed. “In order to carry out the removal of the pedestrian bridge located on the PR-2 road, it was agreed that the road will be closed in both directions,” said Vélez Vélez in written declarations. The work will be carried out by staff of the Public Buildings Authority. As a preventive meas…