Skip to main content
See every side of every news story
Published loading...Updated

They Control Leak in Aqueduct on Boulevard 2000; Repair Presents 60% Advance - Uniradio Informa Baja California

Summary by Uniradio Informa
Currently, the works show an advance of approximately 60 percent and it is estimated that the repair will be completed during the course of this same day.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

6 Articles

Tijuana, 13 March.- CESPT reported that during the early hours of this Friday, repair work was started due to a leak recorded in the Aqueduct Reverse Flow, located on the boulevard 2000, at the height of the Natura fractionation. During the maneuvers around 10:00 am, when the gaskets were removed from the pipeline, a sudden outlet of water was presented, due to the fact that pressure still remained on the line. However, the situation was immedia…

Tijuana.- After several hours of work of the State Commission of Public Services of Tijuana (CESPT) to repair a leak detected days earlier in the Aqueduct Reverse Flow of the boulevard 2000, a new leak opened with force when the staff tried to remove the gaskets from the newly repaired pipeline. The pressure that still remained inside the line caused the water to come out suddenly and with great intensity, forming a jet that reached approximatel…

In connection with a video circulating on social networks about a water leak, CESPT reports that during the morning of this Friday they started repair work at the Aqueduct Reverse Flow, located on the boulevard 2000, at the height of the Natura fractionation. During the maneuvers, around 10:00 a.m., ... The entrance Water leak on the boulevard 2000 was immediately controlled: CESPT was first published on TJNews.

Currently, the works show an advance of approximately 60 percent and it is estimated that the repair will be completed during the course of this same day.

Currently, the works show an advance of approximately 60 percent and it is estimated that the repair will be completed during the course of this same day.

The Tijuana State Public Services Commission (CESPT) reported that repair work began early this morning after a leak was detected in the Reverse Flow Aqueduct, a key infrastructure for the city's water distribution. What do we know about this water leak? The incident is located on Blvd. 2000, near the Natura subdivision, where technical personnel worked on the pipeline to control the damage and prevent further disruption to the water system. Du…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Azteca Baja California broke the news in on Friday, March 13, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal