The Train Passed Through a Signal in Letovice, While the Track Was Protected by ETCS.
7 Articles
7 Articles
In Letovice in the Blanensko region, a train ran through a signal on Thursday. It stopped in time and no one was hurt, but the problem is that the track was equipped with the unified European ETCS security system. Inspector General of the Railway Inspection Jan Kučera described it as alarming. According to him, it must have been a human error.
When the express train from Brno passed the signal in Letovice in the Blanensko region on Thursday evening, before which it was supposed to stop, the ETCS signaling system was working. According to the Inspector General of the Railway Inspection Jan Kučera, it is clear that a human error occurred while operating the system. However, it is not known which one and in what way. Everything is under investigation.
In Letovice in Blansko on Thursday evening, an express train passed through a signal on a line with a unified European ETCS security system. It stopped in time and no one was hurt, said Inspector General of the Railway Inspection Jan Kučera. According to him, the investigation showed that the system worked and it was a human error. According to Kučera, the train was 53 meters away from the express train, which was standing in the station at the …
Inspectors in the South Moravian Region are investigating an accident involving a train that ran through a signal. They currently believe it was human error. The line is equipped with an ETCS safety system that is designed to limit the impact of driver errors.
In Letovice in the Blanensko region, a train passed through a signal on a line with a unified European ETCS security system in the early evening. It stopped in time and no one was hurt, said Inspector General of the Railway Inspection Jan Kučera. However, according to him, this is an alarming situation, and a human error must have occurred.
Letovice (Blanensko) - In Letovice in the Blanensko region, a train passed through a signal on a line with a unified European ETCS security system in the early evening. It stopped in time and no one was hurt, said Jan Kučera, Inspector General of the Railway Inspection, to ČTK. According to him, this is an alarming situation, and a human error must have occurred. The website hn.cz reported in the evening that a passenger train passed through the…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium




