Published • loading... • Updated
The Road that Had Been Abandoned for Three Sectors Was Expected to Be Completed Soon.
Summary by UMUSEKE
1 Articles
1 Articles
Nyamasheke: The road that has been blocking trade between three sectors and Rusizi district for a long time will begin in October 2025 with the installation of laterite, bridges, water pipes and street lights. It is a 23-kilometer road connecting Bushenge, Shangi and Nyabitekeri sectors. Some residents who use it after seeing construction machinery arrive on it were overcome with joy, those who spoke to UMUSEKE shared their feelings. Segatare Pa…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium