Skip to main content
See every side of every news story
Published loading...Updated

The Margina—Holdea Tunnels, Close to the Decisive Moment. The Second Gallery Could Be Pierced on Friday

Summary by Ziua De Vest
Work on the site of the Margina—Holdea lot of the A1 Lugoj—Deva motorway is nearing the end of one of the most difficult stages. Alfred Simonis, President of Timiș County Council, announces that on Friday, September 18, the machines could make the final piercing of the second gallery of the Big Tunnel, which would mark the end of the excavations. “Good news from the construction site [...]

25 Articles

Lean Left

The longest motorway tunnel in construction at this time has been completely pierced. Once the tunnel is completed, expected in the first part of next year, the traffic will be open on section A1 Margna – Holdea (13.16 km), so that the drivers will be able to travel continuously on the motorway from Sibiu to ...

·Romania
Read Full Article
Right

The works at the section Margina – Holdea a Autostrazia A1 Lugoj – Deva have passed one of the most difficult stages.

Historical moment for road infrastructure in Romania. The builders have successfully completed the excavation work of the tunnel at Holdea, the longest in the country. The event marks the official removal of the last major barrier on the highway route A1, which will directly link the Nădlac Customs Sibiul. This is the most important engineering performance in the field of road infrastructure in Romania. Article Pas a important for road infrastru…

The Holdea Tunnel was pierced on Friday, September 18, 2026. Present at the event, the Minister of Transport, Radu Miruţa, said that the Margina–Holdea section of the A1 motorway will be completed in the first part of 2027, most likely in May. "This is more variable, which keeps what will happen on the yard during this period. [...] Article VIDEO The longest road tunnel in Romania was pierced. The Transfăgarăşan record, which was taken down afte…

Historical moment for road infrastructure in Romania. The builders have successfully completed the excavation work of the tunnel at Holdea, the longest in the country.

·Bucharest, Romania
Read Full Article

The Măgina tunnel and the Holdea tunnel on the A1, the longest freeway moon built so far in Romania, was completely pierced. The works lasted 2 years, 24 hours a day, with about 900 people involved the Măgina tunnel and the Holdea tunnel on the A1, the longest freeway moon built so far in Romania, was completely pierced. The works lasted 2 years, 24 hours a day, with about 900 people involved The tunnels built on the Margina – Holdea section of …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources lean Right
50% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Ziua de Vest broke the news on Thursday, September 17, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal