The installation, developed by Celsia and Cubico Sustainable Investments in the department of Tolima, combines 97.82 MWdc of solar followers and 46.28 MWdc of fixed structures supplied by GameChange Energy. The construction required modifications of the design by the conditions of the terrain.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The installation, developed by Celsia and Cubico Sustainable Investments in the department of Tolima, combines 97.82 MWdc of solar followers and 46.28 MWdc of fixed structures supplied by GameChange Energy. The construction required modifications of the design by the conditions of the terrain.