Survey Commission: Deadlines for the Renovation of the Railway Station in Novi Sad Shortened According to Instructions From the Presidency
3 Articles
3 Articles
Today, as part of the Mikser festival, the Commission of Inquiry for the investigation of responsibility for the collapse of the canopy at the Railway Station in Novi Sad presented the report of the Railway Infrastructure, in which it is stated that they acted according to instructions from the Presidency of Serbia.
The Inquiry Commission for the Investigation of Responsibility for the Collapse of the Overhead Canopy at the Novi Sad Railway Station, today, as part of the Mixer Festival, presented the Railway Infrastructure report, which states that they acted on instructions from the Presidency of Serbia. As Vladimir Obradović, a professor at the Faculty of Physics and Technology and a member of the Inquiry Commission, pointed out in the Report on the Degre…
The survey commission presented the report of the Railway Infrastructure, which states that they acted according to instructions from the Presidency of Serbia.
Coverage Details
Bias Distribution
- 100% of the sources lean Left
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage