Published 3 days ago • loading... • Updated 3 days ago
Superfund progress within Anaconda Smelter site not always visible
Workers are building a sediment retention pond and stormwater channels to capture heavy-metal contamination from historic smelter operations.
Summary by The Billings Gazette
2 Articles
2 Articles
Reposted by
Montana Standard
Superfund progress within Anaconda Smelter site not always visible
Superfund cleanup within an Anaconda Regional operable unit is "getting near the end" after 35 years and the remediation work isn't always visible. That includes a new sediment retention pond.
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center2Last Updated100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium







