In Scheeßel, all four earth cables are laid and connected to 37 kilometres. At the end of 2028, the 700-kilometre-long electricity line is to go into operation.
In Scheeßel, all four earth cables are laid and connected to 37 kilometres. At the end of 2028, the 700-kilometre-long electricity line is to go into operation.