Published • loading... • Updated
State signs $1.3 million contract with Juneau Hydropower to electrify proposed Cascade Point Ferry Terminal
Summary by KTOO
1 Articles
1 Articles
State signs $1.3 million contract with Juneau Hydropower to electrify proposed Cascade Point Ferry Terminal
An aerial view of Berners Bay, where the state proposes to build the Cascade Point Ferry Terminal. (Photo by Alix Soliman/KTOO) The state approved a contract on Monday agreeing to pay Juneau’s new hydroelectric utility $1.3 million to power the controversial Cascade Point Ferry Terminal — a project that has yet to be finalized. That money will pay for a transformer and submarine cable required to connect the Alaska Department of Transportation’s…
Coverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
