Published • loading... • Updated
Start-up Aid for the Stuttering Goods Division: Öbb Expands Vienna South Terminal
Summary by Der Standard AT
2 Articles
2 Articles
The capacity of the "Hauptbahnhof des Verkehrs" is expected to increase by 44 percent. An urgently needed step, both for the industry and the ÖBB Group itself
·Vienna, Austria
Read Full ArticleÖBB has started construction of the final expansion phase (phase 2) of the Vienna South freight terminal, which will increase its capacity by 44%. The project was initiated as a result of increasing demand and high utilization and consists of building new lines and rail connections that will simplify handling operations and unlock additional capacity. A total of eight 700-meter loading lines will be available to customers. Another gantry crane s…
Coverage Details
Total News Sources2
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium