Spain Endesa requires security guarantees of the electrical system
Summary by Observador
5 Articles
5 Articles
All
Left
Center
Right
1
It is not an option for the JCF for the ESA to retake control of the electrical system
That the Electric Power Authority (EEA) retakes control of the transmission and distribution of electrical energy to replace LUMA Energy is not an alternative, several members of the Fiscal Control Board (CAB) said Wednesday. “As Puerto Rican I live here, I would not like to go back to the model I had previously, that is, I’m telling you about getting out, that’s my opinion, I’m not speaking on behalf of the Board,” Cameron McKenzie said at a pr…
·San Juan, Puerto Rico
Read Full ArticleCoverage Details
Total News Sources5
Leaning Left0Leaning Right1Center0Last UpdatedBias Distribution100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage