Published • loading... • Updated
Santa Rosa County breaks ground on $30M wastewater plant in East Milton | Santa Rosa Press Gazette
Summary by Santa Rosas Press Gazette
1 Articles
1 Articles
Santa Rosa County breaks ground on $30M wastewater plant in East Milton | Santa Rosa Press Gazette
The facility, designed by Jacobs Engineering and being built by Wharton-Smith, was originally planned at 250,000 gallons per day but has been expanded to a startup capacity of 500,000 gallons per day. The project will be financed through the Milton Interchange Park enterprise fund. Design costs of $988,650 were paid from the general fund. Commissioner Kerry Smith, whose District 2 includes East Milton, said inadequate wastewater capacity has lon…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
