Published • loading... • Updated
RP Sanjiv Goenka Group to set up 3 GW solar cell manufacturing facility in Uttar Pradesh
Summary by Pv Magazine India
1 Articles
1 Articles
RP Sanjiv Goenka Group to set up 3 GW solar cell manufacturing facility in Uttar Pradesh
The RP Sanjiv Goenka Group is set to establish a 3 GW solar cell manufacturing facility, along with a 60 MW captive solar and energy storage system, with a proposed investment of INR 3,000 crore.The RP Sanjiv Goenka Group is set to establish a large-scale solar cell manufacturing hub in Uttar Pradesh. With a proposed investment of INR 3,000 crore, the group plans to set up a 3 GW solar cell manufacturing facility coupled with a 60 MW captive sol…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium