Published • loading... • Updated
Rourke Bridge replacement reaches 25% design completion
Summary by Ground News
1 Articles
1 Articles
Rourke Bridge replacement reaches 25% design completion
LOWELL — The proposed Rourke Bridge replacement has reached the 25% design completion milestone, and the price tag has been disclosed at a recent public hearing as $190 million. Approximately 150 people attended the hearing remotely, including Matthew D’Angelo, a project manager and design consultant, who called the bridge a “critical link” for regional transportation. The Rourke Bridge was a temporary bridge across the Merrimack River when it o…
·Lowell, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
